• Outline of DMZ
  • Border of DMZ
  • Unification policy by period
  • Reunion of Families separated
  • Interchange & cooperation
  • Railroad / highway project
  • Mt.Geumgang tour

6 Railroad / highway project > 03 - Status of railroad & highway connection

Status of railroad & highway connection
Date Contents
2000. 7 1st South and North Korea Minister-level Meeting (SNKMM)
2000. 8 Conference of railroad & highway connection in the 2nd SNKMM
2000. 8. 08 Organization of railroad & highway connection project committee
2000. 9. 18 Conference of highway connection of the Gyeongui line in the 1st Military Working-level Talks between South and North Korea held in Panmunjeom
2001. 12 Completion of the railroad of the Gyeongui line
2002. 4. 30 Completion of Dorasan station
2002. 8 Conference of starting work of railroad & highway of the Gyeongui & Donghae line in the 7th Minister Meeting between South and North Korea
2002. 8 An agreement that South Korea provides North Korea with materials and equipments for the connection construction decided in the 2nd meeting of the South-North Korea Economy Cooperation Committee
2002. 9. 18 A ground-braking ceremony of the connection construction held in South and North Korea at the same time
2002. 10. 19 Starting to provide North Korea with materials and equipments for the connection construction of railroad/highway of the Gyeongui or Donghae line
2002. 12. 31 Completion of a railroad construction of the Gyeongui line
2003. 1. 04 Singing on a basic agreement regarding travel of vehicles on the highway between South and North Korea
2003. 1. 27 Signing on and effectuation of <a provisional agreement for military safety about passage of special highway in the east & west sea territory>
2003. 2. 11 Opening ceremony of a special highway of the Donghae line & starting of Mt. Geumgang sightseeing by land
2003. 3 Site visiting & technical support to inform the method of use materials and equipments
2003. 5 Agreement of opening of railroad tack connection ceremony in the 5th meeting of the South-North Korea Economy Cooperation Committee
2003. 6. 14 Track connection of the Gyeongui & Donghae line in South and North Korea simultaniously
2003. 8 Agreement to complete track & roadbed construction by the end of 2003 in the 5th meeting of the South-North Korea Economy Cooperation Committee
2003. 10 Completing of the 1st materials and equipment provision needed in the fundamental work
2003. 10. 31 Completion of highway construction of the Gyeongui line
2003. 11 Conference about mutual visiting of construction section of the Gyeongui and Donghae line in the 7th South and North Korea Railroad & Highway Working-level Talks
2003. 11 Opening of entrance & exit office both in South and North Korea
2003. 12. 02 Mutual visiting of construction section of the Gyeongui line
2003. 12. 08 Mutual visiting of construction section of the Gyeongui line
2003. 12 The 8th South-North Korea Railroad & Highway Connection Working-level Talks & <Agreements of train travel> left in the next working-level talks
2004 Conference about opening of a vehicle travel control office in the first half of the year
»ó´Ü¸Þ´º·Î °Ç³Ê¶Ù±â º»¹®³»¿ëÀ¸·Î °Ç³Ê¶Ù±â ÇÏ´ÜÁÖ¼Ò·Î °Ç³Ê¶Ù±â